The Snag List: What to Check Before You Move Into a New Build
Updated July 2026
What is a snag list?
A snag list (or "snagging") is an inspection of a newly built home before you complete the purchase, to catch defects, unfinished work, or anything that doesn't match what was promised, so the builder can fix it before you move in, rather than after. "Snags" range from cosmetic (paint marks, a scratched worktop) to functional (a door that doesn't close properly, poor sealing around windows) to more serious (drainage issues, inadequate insulation).
New build doesn't mean defect-free. It's normal for a snag list on an otherwise well-built home to run to dozens of items. The process exists precisely because construction at scale produces inconsistencies.
When to do it
Ideally, snag your home after it's fully finished but before you sign for completion. It's easiest to get things fixed quickly at this stage. If the developer won't allow access before completion, at minimum agree a formal snagging period immediately after with agreed fix timelines in writing.
DIY or hire a professional snagger?
You can do a snag list yourself, but a professional snagging inspector (often a qualified engineer or surveyor) will catch issues an untrained eye misses. Problems with insulation, damp-proofing, or electrical work aren't always visible without some expertise, and a few hundred euro is a small price against the size of the purchase it's protecting.
What to check, room by room
Throughout:
Walls, ceilings and floors for cracks, marks, or uneven finishes
All doors and windows open, close and lock properly, with no gaps or draughts
Paint finish is even and fully covers previous surfaces
Sockets, switches and light fittings all work
Kitchen:
All appliances installed and working (test them, don't just look)
Worktops and units are level, undamaged, and properly sealed
Taps and plumbing run without leaks
Bathrooms:
Sealant around baths/showers is complete, with no gaps
Water pressure and drainage work properly
Extractor fans work
Outside:
Guttering and downpipes are properly fitted
External finishes match what was specified
Boundaries, fencing and driveways match the agreed plan
Documentation:
Building Energy Rating (BER) certificate matches what was advertised
Structural guarantee/warranty documents are provided
Manuals for appliances and heating systems are handed over
What happens after you submit your snag list
The builder should provide a timeline for fixing each item. Get this in writing with specific dates rather than a general "in due course." For anything serious (structural, damp, major functional issues), it's worth agreeing a resolution in writing before final completion.
If something comes up after you move in
Most new builds come with a structural defects guarantee lasting several years, separate from the initial snag list process, so anything that shows up later (not just at handover) is still likely covered. Keep all your documentation from the purchase, including the original snag list and the builder's responses, so it's easy to refer back to them.
This guide is general information, not financial advice. It's worth discussing your specific development and builder's track record with your solicitor and, if relevant, your advisor before completion.
Related guides
Buying ProcessThe Hidden Costs of Buying a House in Ireland
The deposit isn't the only cash you'll need. Stamp duty, legal fees, surveys and more can add thousands on top of the purchase price, and most of it is due before you get the keys.
Read the guide
Buying ProcessNew Build vs. Second-Hand: What First-Time Buyers Should Know
New builds and second-hand homes come with different costs, schemes, timelines and risks attached. This breaks down where they actually diverge, and how to weigh it for your situation.
Read the guide- Mortgage advisor
- No obligation
- Secure enquiry
Speak to a mortgage advisor
Complete the form below and we'll pass your enquiry to our mortgage partner, MC Financial, who will contact you to discuss your mortgage requirements. There is no obligation to proceed.